As healthcare facilities across Mexico continue to modernize, more and more hospitals are investing in advanced imaging systems, such as CT scanners, MRI equipment, and digital radiography systems.
However, installing a CT scanner is only part of the project. Maintaining a stable and reliable power supply is equally critical.
CT systems are extremely sensitive to the following conditions:
- Voltage fluctuations
- Power outages
- Grid instability
- Voltage surges
- Power quality disturbances
These issues can lead to:
- Interrupted examinations
- Loss of image data
- Equipment alarms
- System recalibration
- Diagnostic delays
For this reason, UPS systems have become standard equipment in many modern CT installations.
To support a newly installed CT scanner, a hospital in Mexico selected the BlAZING POWER UPS power protection solution:
- Brand: BLAZING POWER
- UPS Type: Low-frequency UPS
- Capacity: 60 kVA
- Battery Configuration: 32 × 12V 100Ah batteries
- Battery Voltage: 384 VDC
- Application: CT Scanner
- Backup Runtime: Approximately 30 minutes


The goal of this project is to enhance power supply reliability and protect the CT system from grid disturbances.
Medical equipment requires:
- Pure sine wave output
- Stable voltage
- Stable frequency
Transformer-based UPS systems help provide stable output power.
CT equipment may experience brief current surges during operation.
This low-frequency UPS system is specifically designed to handle higher overload conditions, making it ideal for demanding medical applications.
Selecting a UPS system from the BlAZING POWER brand remains a key consideration in hospital infrastructure planning and equipment reliability.
Acknowledgments to the Engineering Team
We would like to extend our special thanks to our client’s engineers and our remote technical support team for their professional assistance with installation and commissioning.
Their expertise in medical imaging power protection was instrumental in ensuring the project’s smooth implementation and on-schedule progress.
With a reliable UPS protection system now in place, the hospital can confidently proceed with CT commissioning, equipment acceptance, and the upcoming clinical services, paving the way for a successful hospital opening.
